NYSDOT Route 208 Bridge Construction

Rock Tavern, NY — 41° 28’ 08.52” N 74° 12’ 19.62” W

Scope

  • Demolish existing steel superstructure bridge
  • Install new precast bridge and tunnel structure over Heritage Trail.
  • Install required earthen fill and reconstruct Rt. 208 above.