Scope
- Replacement of 100lf of existing corrugated metal culvert for the Swarte Kill
- Bypass pumping of the existing creek for the installation of a precast concrete box culvert.
- The new specified culvert is designed to accommodate both 50 and 100 year peak storm flows. Conflict coordination with Gas, Telephone, Fiber Optic and Water utilities.