Scope
- Replacement of 50lf of three existing corrugate metal culvert pipe with a single precast concrete box culvert.
- The new specified culvert is designed to accommodate both 50 and 100 year peak storm flows.
- Full road closure to accommodate a truncated installation schedule. Provide detour bus service for pedestrian traffic.