Culvert replacement-Site E, Rt. 299

New Paltz — 41° 44' 19.21" N, 74° 02' 34.74" W

Scope

  • Replacement of 100lf of existing corrugated metal culvert for the Swarte Kill
  • Bypass pumping of the existing creek for the installation of a precast concrete box culvert.
  • The new specified culvert is designed to accommodate both 50 and 100 year peak storm flows. Conflict coordination with Gas, Telephone, Fiber Optic and Water utilities.