Scope
- 7 miles of second and third shit highway rehabilitation operations.
- Repairing of all ramps, concrete joint repair, deep asphalt milling and repaving of all travel lanes and shoulders.
- Remove and install complete guiderail system project wide.
41° 31’ 11.08” N 74° 01’ 37.95”