Scope
- Mill and Pave North Span of Newburgh-Beacon Bridge; Mill, refurbish structural concrete deck and pave westbound span with waterproof bituminous concrete
- Mill, repair bridge deck, wash bridge deck, clean & dry surface, apply tack coat and pave during a twelve-hour shift, the entire Northern span.
- Bridge joint reconstruction Eastern approach—Mid Hudson Bridge.