NY Rt. 376 (Raymond Ave) & Hooker Ave.

Poughkeepsie — 41° 40' 53.23" N, 73° 53' 46.93" W

Scope

  • Realignment of local town and NYSDOT roadways to further encourage safe passage of the traveling public.
  • Drainage modifications to include storm water pre-treatment hydrodynamic separation units for its underground infiltration system.
  • Ornamental appurtenances were constructed consistent with the period architecture within the greater Vasser College design.
  • Overall regional site beautification designs were implemented including colored asphalt, decorative native stone walls, herbaceous plantings, & deciduous trees.