Precast Bridge Deck Replacement

Pine Bush, NY — 41°35’36.12” N 74°18’36.84” W

Scope

  • Saw-cut roadway bridge deck and prepare for removal.
  • Lift, load, and dispose of deteriorated bridge deck units.
  • Install pre-cast bridge deck panels and install closure pours.
  • All work completed over a twenty-four-hour-per-day, seven-days-per-week effort.